PV PIPE continues to supply gas pipeline API Spec 5L (API 5L X65MOPSL2) for the Nam Con Son 2 project in phase 2 to collect gas from the gas fields Sao Vang - Dai Nguyet and other gas fields in the future in the Cuu Long Basin and Nam Con Son Basin.
The project includes:
Subsea pipeline route: Approximately 118 km long, from KP 207.5 to Long Hai shore station.
Shore pipeline and stations
- Shore Receiving Station at Long Hai (LFS).
- Pipeline from Long Hai shore station to Gas Processing Plant 2 (GPP2) at Dinh Co, approximately 8 km long,
- Pipeline transporting dry gas products from GPP2 to Phu My LNG Terminal, approximately 29.5 km long.
- 1 valve shut-off station at Phuoc Hoa.
- Gas receiving system NCS2 at the gas distribution center Phu My.
Products: Gas pipeline API 5L (API 5L X65MO PSL2)
Time: From September 2019 to May 2020
Technical specifications
OD: 660 – 762 mm
WT: 14.3-23.8 mm
Total length: 158.73 km
Total weight: 47,000 tons