PV PIPE đã sản xuất cho PTSC M&C 1500 tấn ống thép API 2B trong dự án Gallaf Batch 3. Đây là dự án khẳng định bước phát triển nhất định của ngành dầu khí Việt Nam.
Project Gallaf Batch 3 is an expansion of the Al-Shaheen oil field, located offshore in the waters of Qatar. Al-Shaheen is the largest oil field in Qatar and the largest offshore oil field in the world. The entire extraction and operation are carried out by the North Oil Company (NOC).
The project is carried out by PTSC M&C - a Vietnamese marine mechanical service company, acting as the main contractor for package EPC 05. The package includes detailed design, procurement, fabrication, pre-commissioning testing, launching, transportation and installation, connection and commissioning, and completion offshore. The project includes 2 drilling platforms and 1 foundation for the central technology platform.
The Gallaf Batch 3 project is an important step in expanding Qatar's offshore oil extraction activities. The main goal of the project is to optimize oil extraction from the Al Shaheen oil field.
PV PIPE dưới vai trò là đơn vị cung cấp ống thép kết cấu tiêu chuẩn API 2B Spec cho dự án này ở 03 hạng mục. PV PIPE luôn tuân thủ những quy định khắt khe về quản lý chất lượng sản phẩm trước khi xuất xưởng, khẳng định kinh nghiệm và năng lực sản xuất ống thép kết cấu cho ngành dầu khí..
Product: API 2B structural steel pipes
Time: Tháng 1 năm 2021 đến tháng 11 năm 2022
Technical specifications
Product Specification: API 2B
Steel Grade: API 2W Gr50/ API 2W Gr50Z/ EN 10225-1 S355/ VL D36 TM
Outer Diameter (mm): 457 – 762 mm
Wall Thickness (mm): 12-20 mm
Total Length (Km): 3.216
Quantity (tons): 630.35 tấn
Additional information about the Gallaf Batch 3 project can be found here.