The gas pipeline from the Thi Vai LNG terminal to the Phú Mỹ power plant is connected to the Nam Con Son 2 (phase 2) trunk pipeline used for transporting LNG after gas regasification and supplying it to the power plant at high pressure. This project has a total length of 5.9 km and is an important link in the development plan for Vietnam's gas industry through 2025, with a vision towards 2035.
PV PIPE is the provider of API 5L standard steel pipes for this project.
Product type: Gas Steel Pipe
Production time: March 2021 to April 2021
Specification:
Product Specification: API 5L
Steel Grade: API 5L L450MO PSL2
OD (mm): 660.00
WT (mm): 19.1
Total Length (km): 3.80
Quantity (tons): 1,079.480